Notes
Short write-ups of things I learned building the projects, with the numbers and the code behind them.
· ML, Evaluation, Data
Oversampling before the split made my model look better than it was
On a cropland project, SMOTE ran before the train-test split. The score dropped once I measured on untouched points, and the baseline put it in context.
· ML, MLOps, Evaluation
Scoring a LightGBM model without the LightGBM library
The fraud demo's first deploy failed on a missing system library. Reading the model file directly fixed it, and tests show the scores didn't change.